Which of the following pairs in respect of current power generation in India is/are correctly matched? (Rounded Figure) 1. Installed electricity generation capacity : 100000 MW 2. Electricity generation : 660 billion kWh Select the correct answer using the code given below:
  1. (a) 1 only
  2. (b) 2 only
  3. (c) Both 1 and 2
  4. (d) Neither 1 nor 2

Answer: (b) 2 only

Explanation

Checking two figures on India's power generation

These statements test specific rounded figures for India's electricity generation capacity and output around this period.

StatementVerdictReason
1. Installed electricity generation capacity: 100,000 MWIncorrectIndia's actual installed capacity at the time was higher than 100,000 MW, making this figure an understatement
2. Electricity generation: 660 billion kWhCorrectThis figure is roughly consistent with India's actual electricity generation around this period

Correcting the capacity figure:

PointDetail
Installed capacity (actual)Higher than the stated 100,000 MW
Electricity generation~660 billion kWh — accurate

Answer: (b) 2 only.

Why each option is right or wrong

Key point

India's electricity generation figure of ~660 billion kWh checks out — but the installed capacity figure of 100,000 MW understates the actual installed capacity at the time.

Remember

India's electricity generation (~660 billion kWh) checks out; the installed capacity figure of 100,000 MW understates the actual figure.

Common mistakes

Exam tip

Installed capacity (MW) and generation (kWh) are different metrics — always verify each numeric claim against the actual contemporary figures separately.