Jasvin ThinksPracticeMock testsCurrent affairs

UPSC Prelims 2007 Q145: Science & Technology – Quantitative Aptitude

UPSC Prelims 2007, General Studies Paper I · Science & Technology

A and B can complete work together in 5 days. If A works at twice his speed and B at half of his speed, this work can be finished in 4 days. How many days would it take for A alone to complete the job?
  1. (a) 10
  2. (b) 12
  3. (c) 15
  4. (d) 18

Answer: (a) 10

Explanation

Time and work — A alone

Let A's one-day work = a, B's one-day work = b.

ConditionEquation
Together they finish in 5 daysa + b = 1/5
A at double speed, B at half speed finish in 4 days2a + b/2 = 1/4

Solve:

From the first, b = 1/5 − a.

Put it in the second: 2a + (1/5 − a)/2 = 1/4.

→ 2a + 1/10 − a/2 = 1/4.

→ (3/2)a = 1/4 − 1/10 = 3/20.

→ a = 1/10.

So A alone takes 10 days.

(And b = 1/5 − 1/10 = 1/10 → B also takes 10 days.)

Answer: (a) 10.

Why each option is right or wrong

Key point

a + b = 1/5 and 2a + b/2 = 1/4 → a = 1/10 → A alone = 10 days.

Remember

A alone completes the work in 10 days.

Common mistakes

Exam tip

Work problems: always convert days to per-day work (1/days), then add rates. Option check is also fast here.

Sources

Practise UPSC Prelims PYQsTake a timed mock